Architecture, Structural, Civil,
Electrical Engineering, Interior Design
Electrical Engineering, Interior Design
Architectural Design
Renovation & Restoration Site Evaluations & Planning Building Evaluations/Analysis Facility Programming Feasibility Studies Project Management Master Planning Zoning Studies/Analysis Structural Design/Analysis |
Interior Design
Furnishings & Equipment Graphics Cost Estimating Civil Engineering Construction Progress Reviews Mechanical/Electrical Design/Analysis Space Planning |
PRELIMINARY DESIGN
We would begin this phase by confirming the scope of the work to be done, developing the design criteria and alternate solutions to maximize life cycle cost and building environmental needs. On-site reconnaissance and analysis of the information gathered will provide alternate ideas to the Owner by using preliminary plans and sketches. We would be considering cost, construction materials, electrical requirements, and the human and environmental impact of these decisions. The purpose of these studies will be to express our observations, comments, ideas and concerns so that, with participation from the Owner, a total concept will evolve. CONSTRUCTION DOCUMENTS Upon approval of the design, we will prepare construction documents consisting of: Working drawings that shall include architectural/engineering plans, elevations, sections, and details required for successful completion of the Project. Specifications setting forth the methods and the materials to be used, together with the drawings, finalize the scope of work to be done. CONSTRUCTION ADMINISTRATION PHASE Bosch Architecture shall visit the site to ensure a smooth construction process. The progress and quality of the work are very important at this phase. The Architect will determine if the work is within the standards of the construction documents. This phase requires careful time and product management. On the basis of such on-site observations, Bosch Architecture shall keep the client informed of the progress and quality of the work, and written field reports will be submitted. CONSTRUCTION CLOSEOUT POST CONSTRUCTION SERVICES Bosch Architecture shall assist in final closeout of the project. This shall include final inspections and furnishing of a "punch list" which shall record items observed from the inspections that are yet to be completed. Finally, a Statement of Substantial Completion shall be issued by Bosch Architecture establishing the date of occupancy. All warranty coverage shall begin from this date. |